Dodson Macrae Timber Bridge Manufacturing
 
   Email Dodson MacraeHome Page
 
Bridge Design Type 2 Dodson Macrae ~ Bridges


Bridge Design Type 2

Bridge Design Type 2

Laminated

Maximum span 25 metres. The main beams are laminated and the decking is fixed to the top of the beams as in Type 1. Laminating is acheived by steel dowels being inserted at equal spaces along the beam and down through the laminates. A camber can also be achieved.